2020
DOI: 10.1007/978-981-33-4572-0_208
|View full text |Cite
|
Sign up to set email alerts
|

Grid-Connection Control of Small Hydropower Stations Based on the Principle of Quasi-Contemporaneous Grid-Connected

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 2 publications
0
2
0
Order By: Relevance
“…min ≤ P j ≤ P j max (3) Where P j max and P j min are the maximum and minimum allowable output of the power station unit, respectively.Downstream water level variation constraint: the downstream water level must not only meet the maximum and minimum water levels but also the value of water level variation per unit time.…”
Section: P Jmentioning
confidence: 99%
See 1 more Smart Citation
“…min ≤ P j ≤ P j max (3) Where P j max and P j min are the maximum and minimum allowable output of the power station unit, respectively.Downstream water level variation constraint: the downstream water level must not only meet the maximum and minimum water levels but also the value of water level variation per unit time.…”
Section: P Jmentioning
confidence: 99%
“…In the process of power system transformation, new energy power represented by water conservancy and hydropower is incorporated into the power grid system in a high-speed and large-scale manner 2 . Under the new operating environment, grid-connection hydropower stations must undertake comprehensive utilization tasks such as power generation, shipping, and flood control 3 . This is an important support for the construction of a new power system under the dual carbon goals and a reliable guarantee for the efficient use of water resources in the basin.At the same time, the management of water resources in the basin has become more refined and strict.…”
Section: Introductionmentioning
confidence: 99%