2016
DOI: 10.1016/j.engstruct.2016.09.021
|View full text |Cite
|
Sign up to set email alerts
|

Grouted sleeve connections used in precast reinforced concrete construction – Experimental investigation of a column-to-column joint

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

1
65
1
2

Year Published

2017
2017
2023
2023

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 163 publications
(69 citation statements)
references
References 18 publications
1
65
1
2
Order By: Relevance
“…The intensity of the ground motion was quantified by the maximum horizontal peak ground acceleration, which was obtained from ShakeMaps. Some buildings might have two floors or intermediate floors in specific areas, typically along one of the two short edges, where offices are usually located.Modern seismic design codes require adequate structural ductility and compliance with capacity design, with particular regard to connections between precast members [20][21][22][23]. With reference to Italian buildings, mainly comprising low-rise to mid-rise masonry and RC structures, Rota et al [9] proposed typological fragility curves based on earthquake damage data collected in the past 30 years.…”
mentioning
confidence: 99%
See 2 more Smart Citations
“…The intensity of the ground motion was quantified by the maximum horizontal peak ground acceleration, which was obtained from ShakeMaps. Some buildings might have two floors or intermediate floors in specific areas, typically along one of the two short edges, where offices are usually located.Modern seismic design codes require adequate structural ductility and compliance with capacity design, with particular regard to connections between precast members [20][21][22][23]. With reference to Italian buildings, mainly comprising low-rise to mid-rise masonry and RC structures, Rota et al [9] proposed typological fragility curves based on earthquake damage data collected in the past 30 years.…”
mentioning
confidence: 99%
“…Each frame comprises columns clamped on either cast-in-place or precast pocket foundations, main beams simply supported on the column tops and precast slab elements, also simply supported on the main girders. Some buildings might have two floors or intermediate floors in specific areas, typically along one of the two short edges, where offices are usually located.Modern seismic design codes require adequate structural ductility and compliance with capacity design, with particular regard to connections between precast members [20][21][22][23]. However, up until 2005, the region struck by the Emilia earthquakes was not considered as a seismic area by building codes.…”
mentioning
confidence: 99%
See 1 more Smart Citation
“…This includes mild steel pipes (Henin and Morcous 2015;Abd. Rahman et al 2010;Ling et al 2012;Alias et al 2014;Alias et al 2013), high strength steel (Seo et al 2016), aluminum tubes (Ling et al 2008;Tullini and Minghini 2016), spirals (Aldin Hosseini and Abd. Rahman 2013;Aldin Hosseini and Abd.…”
Section: Introductionmentioning
confidence: 99%
“…There could be other forces acting on the connection. Hence, experimental studies were conducted on the precast concrete frames with the connections of beam-to-beam (Aldin Hosseini et al 2015;Sayadi et al 2014), column-to-beam (Ameli et al 2015;Kim 2000), column-to-column (Tullini and Minghini 2016), wall-to-wall (Soudki et al 1995;Zhu and Guo 2016) and column-to-foundation (Haber et al 2014;Belleri and Riva 2012) to determine the structural performance.…”
Section: Introductionmentioning
confidence: 99%