1976
DOI: 10.1007/bf02378603
|View full text |Cite
|
Sign up to set email alerts
|

Grouting and drainage of the foundation of the concrete dam at the Zeya hydroelectric station

Abstract: The roundhead buttress dam for the Zeya hydroelectric station has a height of 112 m, crest length of 714 m, and volume of about 2,200,000 m 3 of concrete,Reservoir filling began in Aug. 1975 and the first unit was put under load in November.The dam is divided lengthwise into 44 sections of three types: fixed gravity and buttress at abutments, single buttress on the spillway part, and double buttress in the powerhouse part.Galleries for grouting and drainage, measuring 3.5x 3.5 m in section, are constructed at… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2011
2011
2011
2011

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 3 publications
0
0
0
Order By: Relevance