2007
DOI: 10.1109/pes.2007.386134
|View full text |Cite
|
Sign up to set email alerts
|

Guidelines for Generator Stability Model Validation Testing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2009
2009
2024
2024

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 10 publications
(4 citation statements)
references
References 31 publications
0
4
0
Order By: Relevance
“…The purpose of model validation is to ensure the correct performance of control systems and validate the computer models used for stability analysis [45]. Consequently, model parameters must represent adequately the dynamic performance of the device being modelled for power system studies [33].…”
Section: Renewable Power Generation Model Validationmentioning
confidence: 99%
See 2 more Smart Citations
“…The purpose of model validation is to ensure the correct performance of control systems and validate the computer models used for stability analysis [45]. Consequently, model parameters must represent adequately the dynamic performance of the device being modelled for power system studies [33].…”
Section: Renewable Power Generation Model Validationmentioning
confidence: 99%
“…There is considerable international experience regarding the validation of synchronous generator models [45,[47][48][49][50]. Validation methods are mainly based on staged tests, involving off-line tests such as enhanced short-circuit tests and partial load rejection tests [45], and frequency response testing covering Standstill Frequency Response (SSFR), Open Circuit Frequency Response (OCFR) and On Line Frequency Response (OLFR) described in [45,51]. Both processes take significant time and are expensive, and might be harmful for the generating units [50].…”
Section: Renewable Power Generation Model Validationmentioning
confidence: 99%
See 1 more Smart Citation
“…One of the most usual methods is to compare simulated results with its actual measurements after a disturbance. In general, there are three types of tests: offline test, open circuit test, and online test 4,26 . In offline and open circuit tests, the unit must be out of service and be in no‐load conditions, respectively.…”
Section: Introductionmentioning
confidence: 99%