Hart and Mas-Colell consistency in PERT problems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(11 citation statements)
references
References 16 publications
0
11
0
Order By: Relevance
“…In Bergantiños et al (2018), the problem of allocating the delay costs is addressed in the context of cooperative game theory using a Shapley rule. As we illustrate later in an example, the Shapley rule allocates the delay costs in a more sensible way than the proportional rules, at least in some cases.…”
Section: Project Managementmentioning
confidence: 99%
See 1 more Smart Citation
“…In Bergantiños et al (2018), the problem of allocating the delay costs is addressed in the context of cooperative game theory using a Shapley rule. As we illustrate later in an example, the Shapley rule allocates the delay costs in a more sensible way than the proportional rules, at least in some cases.…”
Section: Project Managementmentioning
confidence: 99%
“…Özdamar and Ulusoy (1995) present a survey of the problem of resource constraints. To distribute the delay cost of the project among the activities, Brânzei et al (2002) provide two rules using, respectively, a game theoretical and a bankruptcy-based approach, and Bergantiños et al (2018) introduce and analyse a consistent rule based on the Shapley value.…”
Section: Introductionmentioning
confidence: 99%
“…In this section, we describe the problem with which we deal. We first formally introduce a deterministic scheduling problem with delays mainly following Bergantiños et al (2018): Definition 2.1 A deterministic scheduling problem with delays P is a tuple (N , ≺, x 0 , x, C) where:…”
Section: The Problemmentioning
confidence: 99%
“…In Castro et al (2007), the core of a class of transferable utility cooperative game (in short, a TU-game) arising from a delay cost-sharing problem was studied. In Bergantiños et al (2018), a consistent rule based on the Shapley value was introduced and analysed. Estévez-Fernández et al (2007) and Estévez-Fernández (2012) dealt with some classes of TU-games associated with projects whose activities might have been delayed or advanced by generating delay costs or acceleration benefits of the corresponding projects.…”
Section: Introductionmentioning
confidence: 99%
“…Project management can be done with the appropriate application and  Corresponding author: mdachyar@yahoo.com integration of the process in the project to execute it effectively and efficiently [3]. Implementation of project management can be done by various methods, such as using the conventional method like Critical Path Method [5], Program Evaluation Review Technique [6], or alternative methods like Critical Chain Method [7], Business Process Reengineering [8], and various other methods. Critical path is the path of activities sequences that determine the duration of the project.…”
Section: Literature Reviewmentioning
confidence: 99%