2023
DOI: 10.30822/arteks.v8i1.2193
|View full text |Cite
|
Sign up to set email alerts
|

Hausa vernacular architectural style of early Mosque buildings: A case stuy of Yandoka Street Moswue, JOS

Abstract: This paper investigates the impact of modern and contemporary trends on an eighty-seven years’ old mosque in Jos built in the typical Hausa Vernacular Architectural style, as well as the extent to which its vernacular features have been lost and/or retained. The study focused on selected architectural features which do not essentially affects the performance of the primary mosque's functions. A qualitative survey was adopted using case study approach and complemented with content analysis of related literature… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 13 publications
0
0
0
Order By: Relevance
“…The adverse consequence of the debasement in the development business in Nigeria incudes (Bello et al 2023); Construction project abandonment as a result of inadequate planning and management, high project costs as a result of inflated bill of quantities and unrealistic claims made during project execution, subpar workmanship as a result of inadequate supervision, project collapses as a result of low labor productivity and output, construction project delays, and inefficient use of resources like labor and materials corruption in the construction industry can be particularly detrimental due to its central role in development (Boeckmann 2009;Ilesanmi, Folorunso, and Kolade 2023).…”
Section: Literature Reviewmentioning
confidence: 99%
“…The adverse consequence of the debasement in the development business in Nigeria incudes (Bello et al 2023); Construction project abandonment as a result of inadequate planning and management, high project costs as a result of inflated bill of quantities and unrealistic claims made during project execution, subpar workmanship as a result of inadequate supervision, project collapses as a result of low labor productivity and output, construction project delays, and inefficient use of resources like labor and materials corruption in the construction industry can be particularly detrimental due to its central role in development (Boeckmann 2009;Ilesanmi, Folorunso, and Kolade 2023).…”
Section: Literature Reviewmentioning
confidence: 99%
“…The primary ritual activity is obligatory prayer, which has specific rules and procedures, such as to straighten and align the prayer lines (Widodo and Artiningrum 2022). According to hadith, this process involves shoulder-to-shoulder and heelto-heel contact among congregants (Paramitha and Salura 2020;Bello et al 2023). Even though non-ritual activities also require closeness, there are no strict guidelines governing this aspect (Arita, Budiyuwono, and Saliya 2021;Mintaredja, Salura, and Fauzy 2021).…”
Section: Introductionmentioning
confidence: 99%