2010
DOI: 10.1016/j.eswa.2009.08.017
|View full text |Cite
|
Sign up to set email alerts
|

Heuristic method on solving an inventory model for products with optional components under stochastic payment and budget constraints

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

2
10
0

Year Published

2013
2013
2022
2022

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 11 publications
(12 citation statements)
references
References 23 publications
2
10
0
Order By: Relevance
“…On the other hand, under budget constraints, managers will be more devoted to improving the IS information quality, including high accuracy, reliability and relevance, which in turn improve process innovation and product innovation. These interpretations are consistent with the arguments of previous studies such as Nohria and Gulati (1997), Dunk (2007), Wang and Hu (2010) and Ahmadizar and Soltanpanah (2011). The positive link between IS information quality and ICC is in line with the view of Todtling et al (2009) who believed that good information quality facilitates innovation.…”
Section: Discussionsupporting
confidence: 92%
See 1 more Smart Citation
“…On the other hand, under budget constraints, managers will be more devoted to improving the IS information quality, including high accuracy, reliability and relevance, which in turn improve process innovation and product innovation. These interpretations are consistent with the arguments of previous studies such as Nohria and Gulati (1997), Dunk (2007), Wang and Hu (2010) and Ahmadizar and Soltanpanah (2011). The positive link between IS information quality and ICC is in line with the view of Todtling et al (2009) who believed that good information quality facilitates innovation.…”
Section: Discussionsupporting
confidence: 92%
“…A low level of budget slack would encourage them to focus on the effective use of IS information, which is critical to process control and product design (Nohria and Gulati, 1997;Yang et al, 2009). Previous information system research has suggested that a system has better stability and accuracy when the budget is constrained (Wang and Hu, 2010;Ahmadizar and Soltanpanah, 2011). Thus, this study contended that the four factors of ICC constitute an IT manufacturing firm's innovation capability, and the ICC will demonstrate a greater capacity when the level of budget slack is lower and the degrees of IS information quality, process innovation and product innovation are all higher.…”
Section: Introductionmentioning
confidence: 99%
“…The budgetary constraint, in turn, includes the service costs of the vanilla box and optional components. A detailed account of the model development can be found in [15,16].…”
Section: B Model Formulation and Set Of Equationsmentioning
confidence: 99%
“…They incorporated the service costs into the budget constraint in a multi-item inventory control system and proposed two heuristic procedures to solve the model. They [4] presented a multi-item (Q,r) model for the correlative demands between the necessary components and the optional components. The maximum investment in the inventory was assumed to be random.…”
Section: Literature Reviewmentioning
confidence: 99%
“…They showed that the standard cost method for making the outsourcing decision is inferior to the CPCM. Balakrishnan & Cheng [12] used a spreadsheet-based optimizer for more 4 effective implementation of make-or-buy decisions. This method was not also appropriate for the large-sized instances.…”
Section: Literature Reviewmentioning
confidence: 99%