Original scientific paper Resource-constrained project scheduling problem is known as a NP-Hard problem in literature. In this research, discounted cash flow policy is suggested for the resources-constrained project scheduling problem for the first time while in classic models, it has been assumed that price of the required resources is fixed for performing the activities and resources can be prepared only with one price rate in the market. Goal of this problem is to determine optimal starting time of the project activities considering precedence constraints and the available resources such that the project completion time can be minimized. In order to solve the proposed model, a hybrid algorithm based on two algorithms i.e. genetic and simulated annealing has been suggested. In this method, genetic algorithm has been designed as the main framework of the proposed method and simulated annealing method as a new operator and in order to improve local search of the main algorithm. Since values of the parameters have considerable effect on efficiency of these algorithms, therefore, a new statistical approach based on the stepwise regression has been presented to set the proposed algorithms parameters. Results of the calculations show high efficiency of proposed algorithm in terms of solution time and optimal solutions. Keywords: discount; discounted cash flow; parallel simulated annealing algorithm; pricing; project scheduling Algoritam paralelnog simuliranog žarenja u rješavanju problema programiranja projekta politikom diskontne solventnosti u strategiji određivanja cijene dobavljača projekta Izvorni znanstveni članak Problem programiranja projekta s ograničenim sredstvima u literaturi je poznat kao NP-Hard problem. U ovom istraživanju prvi se puta predlaže politika diskontne solventnosti za rješavanje problema programiranja projekta s ograničenim sredstvima. U klasičnim modelima pretpostavlja se da je cijena potrebnih resursa za izvršenje aktivnosti fiksna i resursi se mogu pripremiti samo po jednoj cijeni na tržištu. Problem je usmjeren na određivanje optimalnog polaznog vremena aktivnosti projekta uzimajući u obzir ograničenja prioriteta i dostupne resurse u svrhu skraćenja vremena završetka projekta. Kako bi se riješio predloženi model predlaže se hibridni algoritam zasnovan na dva algoritma, genetskom i simuliranog žarenja. U toj metodi genetski algoritam služi kao glavni okvir predložene metode a metoda simuliranog žarenja kao novi operater i u svrhu poboljšanja lokalnog pretraživanja glavnog algoritma. Budući da vrijednosti parametara znatno utječu na učinkovitost tih algoritama, daje se novi statistički pristup temeljen na stepenastoj regresiji (stepwise regression) za postavljanje parametara predloženih algoritama. Rezultati proračuna pokazuju visoku učinkovitost predloženog algoritma u odnosu na vrijeme donošenja rješenja i optimalnih rješenja.