2006
DOI: 10.1007/s10845-005-5514-0
|View full text |Cite
|
Sign up to set email alerts
|

Heuristics for the Unrelated Parallel Machine Scheduling Problem with Setup Times

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

3
91
0
9

Year Published

2011
2011
2022
2022

Publication Types

Select...
4
4

Relationship

1
7

Authors

Journals

citations
Cited by 147 publications
(103 citation statements)
references
References 39 publications
3
91
0
9
Order By: Relevance
“…Las variantes GRASP-1 (0,1) y GRASP-4 (0,0) se comparan con las metaheurísticas búsqueda tabú propuesta por [1], Meta-Raps propuesta por [5] y ACO propuesta por [10]; los resultados de las metaheurísticas son presentados por [10]. En la Tabla 5 se presenta la diferencia porcentual promedio respecto de la cota inferior considerando la mejor solución obtenida por cada método.…”
Section: Resultsunclassified
See 1 more Smart Citation
“…Las variantes GRASP-1 (0,1) y GRASP-4 (0,0) se comparan con las metaheurísticas búsqueda tabú propuesta por [1], Meta-Raps propuesta por [5] y ACO propuesta por [10]; los resultados de las metaheurísticas son presentados por [10]. En la Tabla 5 se presenta la diferencia porcentual promedio respecto de la cota inferior considerando la mejor solución obtenida por cada método.…”
Section: Resultsunclassified
“…En [5] el problema se resuelve utilizando una metaheurística para la búsqueda aleatoria priorizada llamada Meta-Raps, que es una estrategia que usa tanto una heurística de construcción como una heurística de mejora para generar soluciones de alta calidad, mostrando también mejores resultados que la heurística PH. Más adelante, Arnaout, Rabadi y Musa [11] introducen un algoritmo ACO de optimización de colonia de hormigas (denominado ACO I) de dos etapas: la asignación de trabajos y la secuenciación de los trabajos asignados.…”
Section: Introductionunclassified
“…Despite the fact that Meta-RaPS conserves in essence Arcus's underlying original COMSOAL idea, in practice, the methods differ considerably. Meta-RaPS has been successfully applied to a number of combinatorial problems such as the Resource Constrained Project Scheduling Problem (DePuy and Whitehouse, 2001), the Travelling Salesman Problem (TSP) , the 0-1 Multidimensional Knapsack Problem , the Vehicle Routing Problem (Moraga, 2002), and the Parallel Machine Scheduling Problem with Setup Times (Rabadi et al, 2006).…”
Section: Meta-rapsmentioning
confidence: 99%
“…The average job processing time (or duration) λ N/A The release rate Uniform distributions are commonly employed in the generation of scheduling benchmark problems because they result in large levels of variance and thus subject solution methods to the most unfavourable conditions (Rabadi et al, 2006;Weng et al, 2001). For these reasons we utilised uniform distributions.…”
Section: Problem Generationmentioning
confidence: 99%
“…The objective focuses again around the minimization of the production time. Also in parallel study of unrelated machines are papers analyzing the sequence of separate operations such as the ones of Chen et al (2006), while Rabadi et al (2006) focus on the study of dependent sequences. Minimizing delays is also examined in environments of unrelated parallel machines.…”
mentioning
confidence: 99%