Hierarchical structure and transfer mechanism to assess the scheduling-related risk in construction of prefabricated buildings: an integrated ISM–MICMAC approach

Abstract: PurposeUnder the background that engineering, procurement and construction (EPC) contracting model is introduced to adapt to the highly fragmented characteristics of prefabricated construction, the schedule management of general contractor is faced with the challenge of dynamic transmission and interaction of construction scheduling-related risk. The purpose of this paper is to develop the hierarchy of prefabricated construction scheduling-related risks from the perspective of the general contractor, and to an… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
9
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
8
1
1

Relationship

0
10

Authors

Journals

citations
Cited by 16 publications
(9 citation statements)
references
References 66 publications
0
9
0
Order By: Relevance
“…Iqbal et al (2023) examined the critical success factors of energy-efficient supply chains in the construction industry by integrating the Delphi, ISM, and MICMAC method. Fan et al (2022) used an integrated ISM-MICMAC approach to assess the scheduling-related risk in the construction of prefabricated buildings. Thereby, multi-criteria analysis is postulated as a powerful tool to aid decision-makers in better selecting their options in a wide range of construction problems.…”
Section: Application Of Mcdm Methods In the Construction Industrymentioning
confidence: 99%
“…Iqbal et al (2023) examined the critical success factors of energy-efficient supply chains in the construction industry by integrating the Delphi, ISM, and MICMAC method. Fan et al (2022) used an integrated ISM-MICMAC approach to assess the scheduling-related risk in the construction of prefabricated buildings. Thereby, multi-criteria analysis is postulated as a powerful tool to aid decision-makers in better selecting their options in a wide range of construction problems.…”
Section: Application Of Mcdm Methods In the Construction Industrymentioning
confidence: 99%
“…Ranjbar et al discovered the risk indicators of hazardous, earthquake-induced structures using the modified, hierarchical, fuzzy TOP-SIS approach [14]. In order to assess the risk of assembled risk in building construction and scheduling, as well as to look at the method by which risks are transmitted, Fan et al used hierarchical analysis [15]. The sustainability of SIP buildings in rural China was evaluated by Bai et al based on AHP-gray correlation analysis, and they offer a guide to help builders select the optimal building structure for rural China [16].…”
Section: Projection Pursuit Methodsmentioning
confidence: 99%
“…Liu et al, 2018), controlling project investment risks (X.-J. Li, 2020), and conducting risk assessments during the construction phase (Fan et al, 2023;Pervez et al, 2022;Tatari, 2023). Additionally, studies on risk management across different stages of prefabricated steel structure construction have become more comprehensive (Y.…”
Section: Literature Reviewmentioning
confidence: 99%