2020
DOI: 10.1049/iet-gtd.2019.1559
|View full text |Cite
|
Sign up to set email alerts
|

High voltage underground cable bonding optimisation to prevent cable termination faults in mixed high‐voltage lines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
3
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 25 publications
0
1
0
Order By: Relevance
“…These methods are used as objective function because these methods are widely used for the forecasting studies in electrical engineering [30][31][32][33][34][35][36]. In hybrid artificial neural networks, the weights of artificial neural network are updated by optimization method [37]. The prediction methods should be trained with the training data to predict MV, MC, and MHC values.…”
Section: Usage Of the Prediction Methods In Optimization Processmentioning
confidence: 99%
“…These methods are used as objective function because these methods are widely used for the forecasting studies in electrical engineering [30][31][32][33][34][35][36]. In hybrid artificial neural networks, the weights of artificial neural network are updated by optimization method [37]. The prediction methods should be trained with the training data to predict MV, MC, and MHC values.…”
Section: Usage Of the Prediction Methods In Optimization Processmentioning
confidence: 99%