“…The uncertainty distribution on these numbers is assumed triangular, with the estimate being the maximum, because it is unlikely that it actually rained throughout all 15-minute periods; the best estimate and minimum are assumed 85% and 50% of the maximum, respectively. Table A1, Part 1 of this LLNL Dose Reconstruction (Peterson 2004a). Because this equation was derived from fractions that represent the maximum time it could have rained, but because the real fraction may be either higher or lower than the best fit to the linear regression, a triangular distribution with maximum, best estimate, and minimum at 1.1, 0.9, and 0.6 times the calculated value, respectively, has been assigned.…”