Historical pipeline construction cost analysis

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

2
22
0

Year Published

2012
2012
2024
2024

Publication Types

Select...
7
1
1

Relationship

1
8

Authors

Journals

citations
Cited by 49 publications
(24 citation statements)
references
References 2 publications
2
22
0
Order By: Relevance
“…Rui and friends [15] aimed to provide a reference for pipeline construction by analyzing historical pipelines' cost data. In this study, 412 pipeline cost data were used published in Petroleum and Gas Magazine between years 1992 and 2008.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Rui and friends [15] aimed to provide a reference for pipeline construction by analyzing historical pipelines' cost data. In this study, 412 pipeline cost data were used published in Petroleum and Gas Magazine between years 1992 and 2008.…”
Section: Literature Reviewmentioning
confidence: 99%
“…bulk discount). More realistic infrastructure construction cost models and analysis can be found in Adeli and Wu (1998); Adeli and Sarma (2006); Rui et al (2011).…”
Section: Construction Cost Modelmentioning
confidence: 99%
“…A plausible explanation is that a large pipeline-compressor-station project, normally associated with a large pipeline project, can induce a demand that influences market price (e.g., labor salaries and material prices) and increases compressor-station-construction costs further. Expectation of increased pipelineand compressor-station-construction costs can induce an increase in current unit construction costs (Rui et al 2011b). Suppliers would raise prices with expectation for more demand.…”
Section: Cost Overruns In Terms Of Compressor-station Project Sizementioning
confidence: 99%
“…Jacoby (2001) found that 74 projects with a minimum cost of USD10 million had 25% cost overruns. Rui et al (2011aRui et al ( , 2011bRui et al ( , 2012aRui et al ( , 2012b investigated the cost overruns of 412 pipeline projects between 1992 and 2008, finding an average of 4.9% cost overrun for material, 22.4% for labor, -0.9% for miscellaneous, 9.1% for right of way (ROW), and 6.5% for total installed costs. In addition, literature reviewed also showed that cost overruns exist over time.…”
Section: Introductionmentioning
confidence: 99%