2010
DOI: 10.1007/978-3-8348-9729-9
|View full text |Cite
|
Sign up to set email alerts
|

Hochwasserrisikomanagement

Abstract: Im vorliegenden Buch wird das integrierte Hochwasserrisikomanagement als fortlaufender iterativer Prozess mit seinen Phasen Hochwasserereignis, Hochwasserbewältigung, Regeneration und Hochwasservorbeugung analysiert, beschrieben und mit Praxisbeispielen unterlegt.Neben der Darstellung des aktuellen Wissensstandes werden umfangreiche Schlussfolgerungen aus einer Ex-post-Evaluation des Extremereignisses von 2002 gezogen, systematisiert und für die praktische Anwendung aufbereitet.Die Inhalte der EG-Hochwasserris… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2016
2016
2018
2018

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 26 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Retreat with reconstruction of damaged buildings at another location has only been performed in isolated cases since 2002, e.g., in Röderau-Süd, near Dresden (Müller 2010), which among other things could be ascribed to the high costs, which will as a rule only be taken on partly by insurances or public authorities (DKKV 2015). In future, the role of relocation in flood risk management should be clarified.…”
Section: Adapted Use Of Flood-prone Areasmentioning
confidence: 99%
“…Retreat with reconstruction of damaged buildings at another location has only been performed in isolated cases since 2002, e.g., in Röderau-Süd, near Dresden (Müller 2010), which among other things could be ascribed to the high costs, which will as a rule only be taken on partly by insurances or public authorities (DKKV 2015). In future, the role of relocation in flood risk management should be clarified.…”
Section: Adapted Use Of Flood-prone Areasmentioning
confidence: 99%
“…For example, in the Dresden region in the Free State of Saxony, Germany, after the Elbe river flood in August 2002, dykes were rebuilt, new dykes and water retention basins constructed, to mention only some measures (for an overview see Müller 2013, DKKV 2015. Changes in 'material' assets were and are accompanied by intensive efforts to develop new management approaches at regional and local level.…”
Section: Introductionmentioning
confidence: 99%