Proceedings of SPE/AAPG Western Regional Meeting 2000
DOI: 10.2523/62520-ms
|View full text |Cite
|
Sign up to set email alerts
|

Horizontal Open Hole Well Displacement Practices: Effect of Various Techniques on Well Productivity, Operational Complexity, and Overall Project Economics

Abstract: TX 75083-3836, U.S.A., fax 01-972-952-9435. AbstractOpen hole gravel pack completions can have many advantages over comparable cased hole completions. This is especially true for horizontal well applications. However, because no perforations are present to penetrate the filtercake, borehole conditioning prior to gravel packing is critical to ensure good well productivity. To address this issue various borehole cleanup techniques have been developed. These different techniques have been adopted to address speci… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2002
2002
2009
2009

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 11 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…For any OHGP completion, formation damage prevention is key to success. To ensure a nondamaged wellbore, proper wellbore-displacement techniques must be followed (Mathis et al 2000). For this well, upon completion of the drilling operation, the hole was conditioned with the drilling assembly still in the well.…”
Section: Gravel-pack Executionmentioning
confidence: 99%
“…For any OHGP completion, formation damage prevention is key to success. To ensure a nondamaged wellbore, proper wellbore-displacement techniques must be followed (Mathis et al 2000). For this well, upon completion of the drilling operation, the hole was conditioned with the drilling assembly still in the well.…”
Section: Gravel-pack Executionmentioning
confidence: 99%
“…To insure a non-damaged wellbore, proper wellbore displacement techniques must be followed. 8 For this well, upon completion of the drilling operation, the hole was conditioned with the drilling assembly still in the well. The displacement was performed by pumping two viscous push pills, followed by low-viscosity fluid consisting of 9.5 ppg NaCl completion brine.…”
Section: Hole Displacementmentioning
confidence: 99%
“…Field experience indicates the importance of high rate in achieving maximum productivity from open hole gravel packs. 4 After displacing the open hole to brine or solids free polymer, it is especially critical that hydrostatic pressure greater than reservoir pressure be maintained on the filter cake to keep the hole open and stable. Special care should be taken to ensure that this overbalance condition is applied for all operations until gravel is placed against the formation to help stabilize the open hole.…”
Section: Iadc/spe 77214mentioning
confidence: 99%