SPE Annual Technical Conference and Exhibition 2010
DOI: 10.2118/133336-ms
|View full text |Cite
|
Sign up to set email alerts
|

Horizontal Well Optimization With Inflow Control Devices (ICDs) Application in Heterogeneous and Dipping Gas-Capped Oil Reservoirs

Abstract: SS field is located offshore East Malaysia. 2 exploration wells discovered multiple dipping reservoirs, with oil column of about 40 m. The heterogeneous reservoirs, combined with a very large gas cap (i.e. m size of 2) and moderate aquifer strength impose challenges to maximize recovery from this field. Field development study has formulated 14 horizontal wells with 3 water injectors to achieve recovery factor of 30%. Optimum reservoir management strategy requires a delicate balance of gas cap expansion and wa… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2010
2010
2024
2024

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 16 publications
(2 citation statements)
references
References 6 publications
0
2
0
Order By: Relevance
“…Since that initial field trial, FCDs/ICDs have been extensively used across the globe to delay water/gas breakthrough in high production rate horizontal wells (Abdelfattah et al 2012;Al-Khelaiwi and Davies 2007;Jain et al 2013;Karim et al 2010;Li et al 2013). Multiple differing FCD geometries have been commercialized to accomplish the goal of equalizing reservoir flux along the wellbore.…”
Section: Historical Application Of Flow Control Devices (Fcds)mentioning
confidence: 99%
“…Since that initial field trial, FCDs/ICDs have been extensively used across the globe to delay water/gas breakthrough in high production rate horizontal wells (Abdelfattah et al 2012;Al-Khelaiwi and Davies 2007;Jain et al 2013;Karim et al 2010;Li et al 2013). Multiple differing FCD geometries have been commercialized to accomplish the goal of equalizing reservoir flux along the wellbore.…”
Section: Historical Application Of Flow Control Devices (Fcds)mentioning
confidence: 99%
“…Since that initial field trial, FCDs/ICDs have been extensively used across the globe to delay water/gas breakthrough in high production rate horizontal wells (Abdelfattah et al 2012;Al-Khelaiwi and Davies 2007;Jain et al 2013;Karim et al 2010;Li et al 2013). In late 2008, FCDs were proposed for the use in a steam-assisted gravity drainage (SAGD) well pair.…”
Section: Introductionmentioning
confidence: 99%