HVAC Operation Schemes and Commissioning Process Resolving Stack Effect Problem and Adjusting According to Changes in the Environment: A Case Study in High-Rise Building in South Korea

Abstract: Various problems often arise in high-rise buildings during the winter months due to the stack effect. In this study, the high-rise building of interest, located in South Korea, was experiencing constant loud noises in the winter due to the stack effect. Thus, we created a noise level reduction plan by creating a method for pressurizing the high-rise zones of the building according to outdoor conditions. To discover the appropriate pressurization operating modes, we applied a two-year commissioning process to t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 17 publications
0
2
0
Order By: Relevance
“…However, such methods have an inherent defect that only the improved positions will be ameliorated and the contribution to the problem mitigation of the overall building is minor, and they may even transfer the pressure difference from one place to another; e.g., applying partitions and revolving doors is effective for pressure mitigation on the target floor with entrances (e.g., first floor), but may increase the pressure difference on other elevator doors. The global method refers to overall improvements of a building, including improving the overall airtightness of the envelope [20], setting vertical segmentation of shafts [26], and using existing HVAC systems [11,27] or elevator cooling systems [28]. However, implementing global methods is quite challenging and expensive, and therefore, is rarely adopted in practice.…”
Section: Introductionmentioning
confidence: 99%
“…However, such methods have an inherent defect that only the improved positions will be ameliorated and the contribution to the problem mitigation of the overall building is minor, and they may even transfer the pressure difference from one place to another; e.g., applying partitions and revolving doors is effective for pressure mitigation on the target floor with entrances (e.g., first floor), but may increase the pressure difference on other elevator doors. The global method refers to overall improvements of a building, including improving the overall airtightness of the envelope [20], setting vertical segmentation of shafts [26], and using existing HVAC systems [11,27] or elevator cooling systems [28]. However, implementing global methods is quite challenging and expensive, and therefore, is rarely adopted in practice.…”
Section: Introductionmentioning
confidence: 99%
“…In addition, they also put forward various operation modes for the HVAC systems to solve the unpleasant noises due to the stack effect. Even though the mode of pressurizing the high-rise zone of the building based on the outdoor air temperature and wind velocity effectively reduced the noise level, the indoor environment of the high-rise zone changed significantly [17]. However, there are limitations to these methods, such as the energy loss and potential discomfort caused by cold drafts entering from the shafts into indoor spaces [18].…”
Section: Introductionmentioning
confidence: 99%