2018
DOI: 10.17531/ein.2018.4.2
|View full text |Cite
|
Sign up to set email alerts
|

Hybrid fault diagnosis of railway switches based on the segmentation of monitoring curves

Abstract: Switches are one of the most important pieces of infrastructure in railway signal systems, and they significantly influence the efficiency and safety of train operation. Currently, the identification of switch failures mainly depends on the experience of railway staff and the use of simple thresholding methods. However, these basic methods are highly inaccurate and frequently result in false and missing alarms. This paper aims to develop a hybrid fault diagnosis (HFD) method for railway switches. The method is… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
11
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 14 publications
(11 citation statements)
references
References 21 publications
0
11
0
Order By: Relevance
“…An FD technique only recognizes that a problem has occurred in the system, but it does not identify the root causes nor isolate the location of different faults (i.e., there is no isolation step). Thus, many researchers have developed different FDD techniques to deal with railway S&C system CM, and many papers can be found [11,13,15,28,34,[100][101][102][103][104][105][106][107][108][109][110][111][112][113][114][115][116][117]; only selected papers are discussed in the following. It should be clearly noted that the only criteria applied for this selection were that only the most recent published papers were chosen (from 2017 onwards).…”
Section: Fdd Methodsmentioning
confidence: 99%
See 4 more Smart Citations
“…An FD technique only recognizes that a problem has occurred in the system, but it does not identify the root causes nor isolate the location of different faults (i.e., there is no isolation step). Thus, many researchers have developed different FDD techniques to deal with railway S&C system CM, and many papers can be found [11,13,15,28,34,[100][101][102][103][104][105][106][107][108][109][110][111][112][113][114][115][116][117]; only selected papers are discussed in the following. It should be clearly noted that the only criteria applied for this selection were that only the most recent published papers were chosen (from 2017 onwards).…”
Section: Fdd Methodsmentioning
confidence: 99%
“…In addition, they mentioned that their method will be suited to real-time CM since it does not need feature selection, historical data, or prior knowledge. Ou et al [115] proposed a hybrid FDD method for dealing with the CM of a railway S&C system. The hybrid FDD method was based on derivative DTW and a quartile scheme.…”
Section: Fdd Methodsmentioning
confidence: 99%
See 3 more Smart Citations