2014
DOI: 10.1007/s12351-014-0145-x
|View full text |Cite
|
Sign up to set email alerts
|

Hybrid nature-inspired intelligence for the resource leveling problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
12
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
5
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 19 publications
(12 citation statements)
references
References 31 publications
0
12
0
Order By: Relevance
“…The human resource allocation as a sub-problem in many real-life problems, such as in healthcare systems (Lanzarone and Matta, 2014), production systems (Nembhard and Bentefouet, 2015), timetabling problem (Güler et al, 2015), tourism and hotel management (Murakami et al, 2011), project management (Kyriklidis et al, 2014), maintenance management (Bennour et al, 2012), and too many others, considered by many scholars. Compared to facility-type resource, managing human-type resource is more challenging (Wibisono et al, 2016).…”
Section: Literature Reviewmentioning
confidence: 99%
“…The human resource allocation as a sub-problem in many real-life problems, such as in healthcare systems (Lanzarone and Matta, 2014), production systems (Nembhard and Bentefouet, 2015), timetabling problem (Güler et al, 2015), tourism and hotel management (Murakami et al, 2011), project management (Kyriklidis et al, 2014), maintenance management (Bennour et al, 2012), and too many others, considered by many scholars. Compared to facility-type resource, managing human-type resource is more challenging (Wibisono et al, 2016).…”
Section: Literature Reviewmentioning
confidence: 99%
“…In non-critical activity (1,1), (2,3), (3,3) and (3,5), production process (3,3) must be performed directly after (3,1) without postponing according to the process requirement. Thus, adjustment of production process (1,1), (2,3) and (3,3) is discussed here.…”
Section: Figure 1 Plan Network Diagram With Resource Allocationmentioning
confidence: 99%
“…To solve resource allocation project scheduling problem and resource leveling problem at the same time, two new metaheuristic algorithms are utilized in [4]. A class of resource leveling optimization problems often met in modern project management is studied in [5]. For multi-resource allocation balance in construction project group, how to establish effective optimal model is worth researching in more profoundly.…”
Section: Introductionmentioning
confidence: 99%
“…Methods that calculate resource leveling fall broadly into three categories: analytical methods, heuristic methods, and metaheuristic methods [6][7][8]. Geng et al [6] introduced a directional ant colony optimization algorithm to solve nonlinear resource leveling problems.…”
Section: Introductionmentioning
confidence: 99%
“…The authors proposed a cutting plan to strengthen the models and to reduce peaks and valleys for resource requirements at particular points. Kyriklidis et al [8] proposed an effective resolution of resource leveling optimization problems by using nature inspired intelligent methodologies.…”
Section: Introductionmentioning
confidence: 99%