2016
DOI: 10.22260/isarc2016/0020
|View full text |Cite
|
Sign up to set email alerts
|

Hybrid Simulation Modeling of Hoist Down-Peak Operations in Construction Sites

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
3
1

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 11 publications
0
4
0
Order By: Relevance
“…BIM is an essential component of digitalization in the construction industry with numerous advantages (Wang et al, 2018;Forcael et al, 2020). On the other hand, there are some limitations such as not transferring the real sense of the physical project, limited perception, having large quantities of data, sharing and accessing difficulties of BIM models (Arashpour et al, 2015;Xiang et al, 2016). There is a potential for VR-AR adaptions based on BIM to overcome some of the inherent deficiencies of BIM and open a new area for enhancement in the construction industry (Noghabaei et al, 2020).…”
Section: Sasbe 123mentioning
confidence: 99%
See 1 more Smart Citation
“…BIM is an essential component of digitalization in the construction industry with numerous advantages (Wang et al, 2018;Forcael et al, 2020). On the other hand, there are some limitations such as not transferring the real sense of the physical project, limited perception, having large quantities of data, sharing and accessing difficulties of BIM models (Arashpour et al, 2015;Xiang et al, 2016). There is a potential for VR-AR adaptions based on BIM to overcome some of the inherent deficiencies of BIM and open a new area for enhancement in the construction industry (Noghabaei et al, 2020).…”
Section: Sasbe 123mentioning
confidence: 99%
“…On the other hand, there are some limitations such as not transferring the real sense of the physical project, limited perception, having large quantities of data, sharing and accessing difficulties of BIM models (Arashpour et al. , 2015; Xiang et al. , 2016).…”
Section: Introductionmentioning
confidence: 99%
“…Pidd [19], defined DE simulation as "An instant of time at which a significant state change occurs in the system". Simulation entities can be defined as the elements of the system being modeled and individually identified and processed [20]. Moreover, flow entities and resource entities need to be distinguished in simulation [21].…”
Section: Discrete Events Simulation (Des)mentioning
confidence: 99%
“…The reasons behind the selection of BIM are its suitable visualization and interaction platform that improves the learning outcomes along with the collaborative working. Besides numerous advantages of BIM, there are some limitations such as not transferring the real sense of the physical project, having large quantities of data, sharing and accessing difficulties of BIM models (Arashpour et al , 2015; Xiang et al , 2016). Hence, in this study, AR is selected because of being a worthful tool to overcome these limitations.…”
Section: Introductionmentioning
confidence: 99%