“…150 MW (WT), and 35 MV (PV) Pacific (WT) and Catalina Solar, EE.UU. [40] 10 kW (PV), 5 kW (DG), and 50 kWh (BESS) Kythnos Island, Greece [41] 30 MW (GeoT), and 25 MW (PV) Enel Green Hybrid MicroGrid, EE.UU [42] 35 MW (BM), and 22.5 MW (CSP) TermoSolar Borges, Spain. [43,44] 100 MW (WT), 40 MW (PV), 35 MW (BESS) Zhangbei National, China [45] 10 MW (WT + PHESS), and 11 MW (PV) El Hierro Island, Spain [46] 90 kW (WT), 10 kW (WP), and 5 kW (PV) Dangan Island of Guangdong, China [47] PV = Photovoltaic; BESS = Battery Energy Storage System; GeoT = GeoThermal; BM = Biomass; PHESS = Pump Hydro Energy Storage System; BD = Bio Diesel; CSP = Concentrated Solar Thermal Power; WP = Wave Power; WT = Wind Turbine.…”