2013
DOI: 10.1007/978-3-642-38637-4_39
|View full text |Cite
|
Sign up to set email alerts
|

Hybrid Tabu Search for Fuzzy Job Shop

Abstract: Abstract. We consider the fuzzy job shop scheduling problem, which is a variant of the well-known job shop problem, with uncertainty in task durations that we model using fuzzy numbers. We propose a tabu search algorithm for minimising the expected makespan based on reversing arcs within critical blocks. We test the algorithm and then combine it with a genetic algorithm from the literature so we can observe the synergy effect, obtaining better results with the hybrid algorithm than with its components by separ… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 16 publications
0
1
0
Order By: Relevance
“…Jorge Puente et al [4] proposed a novel scheme for fuzzy JSP based on the change of the key block location of the task for searching community structure. Juan José Palacios et al [5] proposed an improved optimization algorithm by mixing the tabu search algorithm and the genetic algorithm. The improved algorithm was applied to solve the problem of fuzzy completion time.…”
Section: Introductionmentioning
confidence: 99%
“…Jorge Puente et al [4] proposed a novel scheme for fuzzy JSP based on the change of the key block location of the task for searching community structure. Juan José Palacios et al [5] proposed an improved optimization algorithm by mixing the tabu search algorithm and the genetic algorithm. The improved algorithm was applied to solve the problem of fuzzy completion time.…”
Section: Introductionmentioning
confidence: 99%