2015
DOI: 10.12736/issn.2300-3022.2015102
|View full text |Cite
|
Sign up to set email alerts
|

Hydropower potential of the lower Vistula

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0
2

Year Published

2018
2018
2023
2023

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 10 publications
(8 citation statements)
references
References 0 publications
0
6
0
2
Order By: Relevance
“…The potential in this area is still possible to implement, because in Poland, only about 15% of the technical potential of flowing water is used. A large unrealized project in the field of hydropower is, for example, the cascade of the lower Vistula River, where another 5 water stages were supposed to be built with a total capacity of 850-1340 MW [48][49][50].…”
Section: Renewable Energy Production For Powering Electric Carsmentioning
confidence: 99%
See 1 more Smart Citation
“…The potential in this area is still possible to implement, because in Poland, only about 15% of the technical potential of flowing water is used. A large unrealized project in the field of hydropower is, for example, the cascade of the lower Vistula River, where another 5 water stages were supposed to be built with a total capacity of 850-1340 MW [48][49][50].…”
Section: Renewable Energy Production For Powering Electric Carsmentioning
confidence: 99%
“…The Lower Vistula Cascade has the highest capacity, with a calculated capacity of 1338.2 MW and a planned energy production of 4153 GWh. According to new calculations by [50], the total power of the Lower Vistula Cascade, depending on adopted variant, can range from 507.1 MW to 857.4 MW, which allows an average annual energy production of 3428.4 to 4221.1 GWh.…”
Section: Rivers' Energetic Potentialmentioning
confidence: 99%
“…An initiative to reactivate the project of another LVC barrage has been taken by Energa SA (electric energy operator) and Gdansk University of Technology (GUT) [2]. In order to analyse the proposed LVC impact on flow conditions, a hydraulic model of the Lower Vistula was developed at the Department of Hydraulic Engineering of GUT.…”
Section: Fig 1 Lower Vistula System With Lvc Barrages Conceptmentioning
confidence: 99%
“…where P -output power (kW), η -overall plant efficiency (-), Qe -discharge through plant (m 3 s -1 ), Hn -net water head (m). The details of LVC hydropower potential calculation were presented in [5]. The aggregated power and energy outputs of LVC system including all the barrages of LVC for the analysed flows through the power plants are presented in Table 3.…”
Section: Hydraulic Calculationsmentioning
confidence: 99%
“…The hydropower potential of the Lower Vistula is about 50% of the hydropower potential of rivers throughout Poland [11]. Hydroelectric power plants located on dams, due to their pro-ecological nature (renewable energy sources-RES), will be important elements of the new national energy system in the future.…”
Section: Introductionmentioning
confidence: 99%