2023
DOI: 10.21203/rs.3.rs-3358133/v1
|View full text |Cite
Preprint
|
Sign up to set email alerts
|

Hydropower Scheduling Under Missing Power Load Data: Optimizing Energy Efficiency and Navigation Performance

Guangqin Huang,
Ming Tan,
Zhihang Meng
et al.

Abstract: Hydropower stations integrated into the grid system often suffer from imbalance in the dispatch of power generation and shipping benefits due to untimely acquisition of load data. In this study, a dispatch model integrating power load forecasting and multi-objective optimization is constructed and practically applied to Shatuo Hydropower Station in Guizhou Province, China. Compared with existing models, the model can accomplish the optimal dispatch of grid-connected hydropower stations in the absence of power … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 28 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?