Hydropower Scheduling Under Missing Power Load Data: Optimizing Energy Efficiency and Navigation Performance
Guangqin Huang,
Ming Tan,
Zhihang Meng
et al.
Abstract:Hydropower stations integrated into the grid system often suffer from imbalance in the dispatch of power generation and shipping benefits due to untimely acquisition of load data. In this study, a dispatch model integrating power load forecasting and multi-objective optimization is constructed and practically applied to Shatuo Hydropower Station in Guizhou Province, China. Compared with existing models, the model can accomplish the optimal dispatch of grid-connected hydropower stations in the absence of power … Show more
Set email alert for when this publication receives citations?
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.