Production and Operations Symposium 2007
DOI: 10.2118/106018-ms
|View full text |Cite
|
Sign up to set email alerts
|

ICD Screen Technology Used to Optimize Waterflooding in Injector Well

Abstract: This paper presents an innovative completion technology, fine tuned by reservoir simulations, for balancing the water injection profile into various sand formation zones in an open-hole completed injector well, increasing sweep efficiency. Traditional injection wells often suffer from the risk of sanding in, hence sand control is beneficial or even required. Another major challenge is to achieve even distribution of the injected water into all zones along the well-bore. Injector wells are oft… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0
2

Year Published

2007
2007
2020
2020

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 22 publications
(4 citation statements)
references
References 0 publications
0
2
0
2
Order By: Relevance
“…2.1.10 Búsqueda de los ICD 2.4. Para esto, se consideró realizar la simulación de la producción histórica que tendría el pozo PRH-13 a través del tiempo, para luego tomar en cuenta el incremento de producción luego de poner en marcha un pozo inyector (Raffn, Hundnes, & Moen, 2007).…”
Section: 18unclassified
“…2.1.10 Búsqueda de los ICD 2.4. Para esto, se consideró realizar la simulación de la producción histórica que tendría el pozo PRH-13 a través del tiempo, para luego tomar en cuenta el incremento de producción luego de poner en marcha un pozo inyector (Raffn, Hundnes, & Moen, 2007).…”
Section: 18unclassified
“…При добыче нефти используют специальные устройства [1,2], обеспечивающие близкий к равномерному расход среды на про-тяжении всего рабочего участка. Длина участка может достигать 100 и более гидравлических диаметров подводящего трубопровода.…”
Section: ключевые слова: дроссельное устройство лабиринтное уплот-неunclassified
“…Inadequate identification of the parameters during the time of designing the trajectory or even during actual drilling, will lead to improper designing of the completion for the drilled well (Raffin et al, 2007).…”
Section: Introductionmentioning
confidence: 99%