1989
DOI: 10.2172/6513696
|View full text |Cite
|
Sign up to set email alerts
|

ICFT: An initial closed-loop flow test of the Fenton Hill Phase II HDR reservoir

Abstract: A 30-day closed-loop circulation test of the Phase I1 Hot Dry Rock reservoir at Fenton Hill, New Mexico, was conducted to determine the thermal, hydraulic, chemical, and seismic characteristics of the reservoir in preparation for a long-term energy-extraction test. loop was3successfully tested with the injection of3 37 000 m of cold water and production of 23 300 m of hot water. Up to 10 MW, was extracteg when the production flow rate reached 0.0139 m /s at 192OC. By the end of the test, the water-loss rate ha… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

1992
1992
2022
2022

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 7 publications
0
0
0
Order By: Relevance
“…The second stage will be critical in execution of expected capacity testing drills and depends on the quality of feasibility study may find suitable sponsor. The third stage is more standard, but successful and timely execution of the construction of GPP and to be in the budget will have also influence to final result [9].…”
Section: Project Execution and Operationmentioning
confidence: 99%
“…The second stage will be critical in execution of expected capacity testing drills and depends on the quality of feasibility study may find suitable sponsor. The third stage is more standard, but successful and timely execution of the construction of GPP and to be in the budget will have also influence to final result [9].…”
Section: Project Execution and Operationmentioning
confidence: 99%