“…The reboiler duty Qr is a repeated periodic signal of 6000 s. The clock period, i.e. the minimum time before the signal is allowed to switch, is 300 s. From former experiments (Logist et al, 2009), it is known that the dynamics of the system are faster at the top of the column. Therefore, the clock period of the other inputs is slightly smaller.…”