Identification of Generation Expansion Plans in Competitive Markets

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
3
0
1

Year Published

2012
2012
2018
2018

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(4 citation statements)
references
References 9 publications
0
3
0
1
Order By: Relevance
“…As mentioned before, the main purpose of GEP in deregulated market is to maximise the revenue of generation companies (GENCOs), while the purpose of GEP in regulated system is to minimise the cost. In deregulated power systems, each GENCO tries to maximise their own revenue while satisfying the independent system operator (ISO) criteria such as reliability, reserve margin and load satisfaction [93]. Electricity market in GEP problem has been widely investigated.…”
Section: Deregulated Electricity Marketmentioning
confidence: 99%
“…As mentioned before, the main purpose of GEP in deregulated market is to maximise the revenue of generation companies (GENCOs), while the purpose of GEP in regulated system is to minimise the cost. In deregulated power systems, each GENCO tries to maximise their own revenue while satisfying the independent system operator (ISO) criteria such as reliability, reserve margin and load satisfaction [93]. Electricity market in GEP problem has been widely investigated.…”
Section: Deregulated Electricity Marketmentioning
confidence: 99%
“…Moreover, GEP problem is also solved by metaheuristic optimization techniques such as ant colony, tabu search, genetic algorithm, honey bee algorithm, artificial immune system, evolutionary programming, and PSO . Also, GEP studies are carried out by considering various single objectives such as minimizing planning cost, maximizing planning profit in deregulated electricity market, improving reliability, reducing environmental pollution, and considering demand‐side management programs . Eventually, GEP problem has been solved subject to several constraints such as reliability, environmental pollution, investment cost, and security …”
Section: Introductionmentioning
confidence: 99%
“…Existe una gran cantidad de variantes con respecto a detalles de modelado y métodos de solución que han sido propuestos para el PEG. Si bien minimizar el costo de instalación y operación de las nuevas unidades generadoras es el principal objetivo del PEG, también se han considerado aspectos como la maximización de las ganancias de los generadores en mercados desregulados (Cerda et al, 2011), maximización de la confiabilidad (Murugan et al;2009) y minimización de emisiones contaminantes (Tekiner et al, 2010). Estudios recientes sobre el PEG han prestado especial atención al tema ambiental.…”
Section: Introductionunclassified