2016
DOI: 10.1515/ace-2015-0073
|View full text |Cite
|
Sign up to set email alerts
|

Identification of Risk Factors of Development and Operation of Roads in the Light of Surveying Work

Abstract: This article aims to identify potentia! risk factors affecting the implementation and synchronisation of surveying and construction works during building and operation ofroads. The task was executed on the basis of literature studies and experience. The article is an introduction to the research that has been conducted by the authors on the reasonably precise index offactors which one may deal with during the implementation of facilities ofthis type. The raised issue is crucial for financial and time reasons, … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 9 publications
(6 citation statements)
references
References 0 publications
0
6
0
Order By: Relevance
“…The aim of the article was to identify geodetic risk factors occurring at the stage of preparation of a construction project. The paper is a continuation and an interesting extension of the issue discussed earlier [7,8].…”
Section: Introductionmentioning
confidence: 75%
“…The aim of the article was to identify geodetic risk factors occurring at the stage of preparation of a construction project. The paper is a continuation and an interesting extension of the issue discussed earlier [7,8].…”
Section: Introductionmentioning
confidence: 75%
“…The authors realize that the issue considered in this paper does not cover all aspects of risk assessment of geodetic works carried out at the stage of data preparation for a project, however it is undoubtedly a continuation and interesting extension of the discussed subject [3,8,9,20].…”
Section: Resultsmentioning
confidence: 99%
“…Stochastic conditions of works implementation should be assumed when intrinsic random events can strongly interfere with the execution of works and powerfully disturb the action of the task teams [8,9]. Of course, the execution and activity of task teams can be disturbed by the external random events that can be generated…”
Section: Allocation Of the Task Teams To The Planned Work In Stochasmentioning
confidence: 99%