2015
DOI: 10.1049/iet-gtd.2014.0361
|View full text |Cite
|
Sign up to set email alerts
|

Identifying critical components for reliability centred maintenance management of deregulated power systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
16
0
1

Year Published

2016
2016
2023
2023

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 39 publications
(17 citation statements)
references
References 30 publications
0
16
0
1
Order By: Relevance
“…A maintenance planning approach was proposed in [110] to determine the optimal time-based maintenance for circuit breakers. Another approach was provided in [111] for identifying the critical components in HL2 to obtain focused maintenance management. The authors in [112] obtained a cost-effective replacement framework that considers the overall system reliability and component criticality.…”
Section: Planning and Optimization Studiesmentioning
confidence: 99%
See 3 more Smart Citations
“…A maintenance planning approach was proposed in [110] to determine the optimal time-based maintenance for circuit breakers. Another approach was provided in [111] for identifying the critical components in HL2 to obtain focused maintenance management. The authors in [112] obtained a cost-effective replacement framework that considers the overall system reliability and component criticality.…”
Section: Planning and Optimization Studiesmentioning
confidence: 99%
“…The authors of [110] improved system reliability and minimized the operation cost by using an optimal maintenance plan for the system's circuit breakers. Others achieved this target by improving a cost-effective replacement plan [111,112]. Supporting a transmission system with FACTS devices is also a promising strategy to improve system reliability, as shown in [26,74,101].…”
Section: Motivations Related To Reliability Enhancementmentioning
confidence: 99%
See 2 more Smart Citations
“…A new approach was introduced as the first step in implementing the RCM in combined power generation and transmission systems to determine the components essential for the desired maintenance management [9]. The criticality assessment focuses on the probability of occurrence of component failure and cost-based consequences.…”
Section: Introductionmentioning
confidence: 99%