2016
DOI: 10.1016/j.nme.2016.04.012
|View full text |Cite
|
Sign up to set email alerts
|

IFMIF, the European–Japanese efforts under the Broader Approach agreement towards a Li(d,xn) neutron source: Current status and future options

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
25
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
9

Relationship

1
8

Authors

Journals

citations
Cited by 49 publications
(25 citation statements)
references
References 46 publications
0
25
0
Order By: Relevance
“…The results of the measurements in the ELTL are not yet published by the time of publication of this paper [31], but given the optimal experimental setup, a close result with the calculations here included is expected, thus providing soundness to this estimation for IFMIF [6, 7]. …”
Section: Resultsmentioning
confidence: 74%
See 1 more Smart Citation
“…The results of the measurements in the ELTL are not yet published by the time of publication of this paper [31], but given the optimal experimental setup, a close result with the calculations here included is expected, thus providing soundness to this estimation for IFMIF [6, 7]. …”
Section: Resultsmentioning
confidence: 74%
“…1), the International Fusion Materials Irradiation Facility, is presently under its Engineering Validation and Engineering Design Activities (EVEDA) phase under the frame of the Broader Approach Agreement between Japan and EURATOM. IFMIF/EVEDA entered into force on June 2007 with the mandate to produce an integrated engineering design of IFMIF and the data necessary for future decisions on the construction, operation, exploitation and decommissioning of IFMIF, and to validate continuous and stable operation of each IFMIF sub-system [6].…”
Section: Introductionmentioning
confidence: 99%
“…The multiple loads that are inherent in fusion require complex testing facilities. It will not be possible to test large-scale components under nuclear irradiation without building a machine akin to a demonstrator, so it is most probable that the effect of irradiation will have to be included from irradiation of materials in facilities such as IFMIF [23] and the smaller DONES [24] from a combination of fission reactors and spallation sources, although this is less than ideal. Physical testing is time-consuming and expensive-the first wall panels for ITER have been under development for a decade or more and are still only at one-third or one-half scale despite the existence of multiple test facilities.…”
Section: Accelerating Demonstrator Developmentmentioning
confidence: 99%
“…A materials test facility to test and validate materials for DEMO under a fusion relevant neutron load and spectrum. The International Fusion Materials Irradiation Facility (IFMIF) [11] is an accelerator-based neutron source. The materials test facility should operate in parallel to ITER such that the new materials are validated before DEMO is going to be built.…”
Section: The European Roadmap To Fusion Energymentioning
confidence: 99%