Robust Optimal Planning and Operation of Electrical Energy Systems 2019
DOI: 10.1007/978-3-030-04296-7_8
|View full text |Cite
|
Sign up to set email alerts
|

IGDT-Based Robust Operation of Integrated Electricity and Natural Gas Networks for Managing the Variability of Wind Power

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
3
2
1

Relationship

1
5

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 24 publications
0
4
0
Order By: Relevance
“…A common approach to joint optimization is to model wind generation as stochastic and uncertain, and develop two-stage stochastic formulations for joint gas and electricity system operations [92]- [94], [150], [151]. Other approaches use interval optimization [152] or draw on robust optimization techniques [64], [153]- [158]. Most of these studies consider operational scheduling, and some include emerging power-to-gas technologies [154], [159]- [161] or expansion planning [64], [156], [162].…”
Section: Uncertainty Management In Gas-electric Energy Systemsmentioning
confidence: 99%
“…A common approach to joint optimization is to model wind generation as stochastic and uncertain, and develop two-stage stochastic formulations for joint gas and electricity system operations [92]- [94], [150], [151]. Other approaches use interval optimization [152] or draw on robust optimization techniques [64], [153]- [158]. Most of these studies consider operational scheduling, and some include emerging power-to-gas technologies [154], [159]- [161] or expansion planning [64], [156], [162].…”
Section: Uncertainty Management In Gas-electric Energy Systemsmentioning
confidence: 99%
“…In [86], unit commitment problem has been solved subject to uncertainties of demand and renewable units generation via robust optimization method and IGDT and the results of employed methodologies are presented to derive the necessary conclusions. Unit commitment problem has been also solved for integrated electricity and gas networks in [87] in which the impact of uncertainty of wind generation on performance of operating system has been assessed with IGDT. Similarly, the unit commitment problem has been investigated without considering security constraints in [53] where demand response program has been used to improve economic performance of system.…”
Section: • Unit Commitmentmentioning
confidence: 99%
“…In instances of low or no curtailed wind power, three effects may occur: 1) low production of gas leading to reduced revenue, 2) longer nonoperational time, and 3) additional costs resulting from increased flushing of the electrolyzer due to more shutdown and startup events (Wulf and Zapp, 2018). In the study conducted by (Li et al, 2018;Mirzaei et al, 2019;Sawas and Farag, 2019;Zhang et al, 2022), curtailed wind power is utilized to supply P2G to facilitate the production of natural gas. The obtained natural gas is used by gas fired generators to generate electricity in the process called power to gas to power (P2G2P).…”
Section: Introductionmentioning
confidence: 99%