2019 Innovations in Power and Advanced Computing Technologies (I-Pact) 2019
DOI: 10.1109/i-pact44901.2019.8960181
|View full text |Cite
|
Sign up to set email alerts
|

Impact Assessment of DG in Radial Distribution Networks

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 7 publications
0
1
0
Order By: Relevance
“…Instrument Protection Some of the protection instruments used are load break switch, busbar, current transformer, and circuit breaker (FIGURE 1). Load break switch is a three-phase circuit breaker which can usually be used at feeder substations or electrically controlled cubicles under normal conditions without any disturbance [7]. The busbar installation is usually installed on the split-circuit panel, based on the PUIL 2000 standard, with the following conditions: red for the R phase, yellow for the S phase, black for the T phase and blue for the Neutral wire [11].…”
Section: Introductionmentioning
confidence: 99%
“…Instrument Protection Some of the protection instruments used are load break switch, busbar, current transformer, and circuit breaker (FIGURE 1). Load break switch is a three-phase circuit breaker which can usually be used at feeder substations or electrically controlled cubicles under normal conditions without any disturbance [7]. The busbar installation is usually installed on the split-circuit panel, based on the PUIL 2000 standard, with the following conditions: red for the R phase, yellow for the S phase, black for the T phase and blue for the Neutral wire [11].…”
Section: Introductionmentioning
confidence: 99%