Impact of Design Risk on the Performance of Design-Build Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
37
0
1

Year Published

2018
2018
2024
2024

Publication Types

Select...
6
2
1

Relationship

1
8

Authors

Journals

citations
Cited by 55 publications
(38 citation statements)
references
References 60 publications
0
37
0
1
Order By: Relevance
“…A Likert scale served as the evaluation set in many previous studies [50,51]. Hence, it was adopted here to measure the severity of each design barrier: 1, 2, 3, 4, and 5 represent very weak, weak, medium, strong, and very strong, respectively [52]. The calculation principle is shown in Equations (5) and (6).…”
Section: Measurement Of Barrier Strengthmentioning
confidence: 99%
“…A Likert scale served as the evaluation set in many previous studies [50,51]. Hence, it was adopted here to measure the severity of each design barrier: 1, 2, 3, 4, and 5 represent very weak, weak, medium, strong, and very strong, respectively [52]. The calculation principle is shown in Equations (5) and (6).…”
Section: Measurement Of Barrier Strengthmentioning
confidence: 99%
“…Estimates generated from the data of the snowball sampling method are asymptotically unbiased, no matter how the seeds are chosen [66][67][68]. Based on this method, a list of 264 potential respondents was developed.…”
Section: Methodsmentioning
confidence: 99%
“…The key success factor affecting the use of the turnkey method on school construction projects is the need to have proper system planning [10,14,16]. After organizing the interviews conducted with experts and organizing directors, the following items should be noted when the school has decided to use the turnkey method: Pre-process:…”
Section: Supporting Measures For the Use Of The Turnkey Methods On Schmentioning
confidence: 99%