2022
DOI: 10.1016/j.jrtpm.2022.100322
|View full text |Cite
|
Sign up to set email alerts
|

Impact of signalling system on capacity – Comparing legacy ATC, ETCS level 2 and ETCS hybrid level 3 systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(4 citation statements)
references
References 21 publications
0
4
0
Order By: Relevance
“…Pascoe and Eichorn introduced the concept of CBTC and how it works, and the CBTC system was compared with other traditional train control systems from the structures, functions and working principles [1]. Ranjbar, et al represented the characters of European Train Control System Level 2 (ETCS L2), hybrid level 3 (ETCS HL3), and analyzed the impacts of typical signaling systems on transport capacity [2]. In the RBC-TCS such as Chinese Train Control System -Level 3 (CTCS-3), train movements pursuing a speed of 350 km/h are controlled by the movement authorities (MAs), which are generated by RBCs.…”
Section: Introductionmentioning
confidence: 99%
“…Pascoe and Eichorn introduced the concept of CBTC and how it works, and the CBTC system was compared with other traditional train control systems from the structures, functions and working principles [1]. Ranjbar, et al represented the characters of European Train Control System Level 2 (ETCS L2), hybrid level 3 (ETCS HL3), and analyzed the impacts of typical signaling systems on transport capacity [2]. In the RBC-TCS such as Chinese Train Control System -Level 3 (CTCS-3), train movements pursuing a speed of 350 km/h are controlled by the movement authorities (MAs), which are generated by RBCs.…”
Section: Introductionmentioning
confidence: 99%
“…The simulation conditions include railway network conditions, train conditions, and cloud computing Divide DF_Train into J partitions DF_Train [1], DF_Train [2], ., and DF_Train[ J], and send each partition to a worker node. 9:…”
Section: Simulation Conditionsmentioning
confidence: 99%
“…Pascoe and Eichorn 1 introduced the concept of CBTC and how it works, and the CBTC system was compared with other traditional train control systems from the structures, functions, and working principles. Ranjbar et al 2 represented the characters of European Train Control System Level 2 (ETCS L2), hybrid level 3 (ETCS HL3), and analyzed the impacts of typical signaling systems on transport capacity. In the RBC-TCS such as Chinese Train Control System – Level 3 (CTCS-3), train movements pursuing a speed of 350 km/h are controlled by the movement authorities (MAs), which are generated by RBCs.…”
Section: Introductionmentioning
confidence: 99%
“…The Train Control System (TCS) plays an important role in the safety assurance of train operation and has been the key to fostering railway transportation system competitiveness. Great effort has been made in finalizing the technical standards of TCS, including the European Train Control System (ETCS) and the Chinese Train Control System (CTCS) [1,2]. In modern TCSs, the increasing autonomy of the train's on-board system indicates a higher requirement to the capability in the full lifecycle, and there is a growing demand for system health monitoring and early assessment.…”
Section: Introductionmentioning
confidence: 99%