Impact of the new electric arc furnace on the level of flicker in surrounding transmission and distribution power system

Abstract: Point of connection of Ironworks is 110 kV bus in 110/35(33) kV "Željezara 1" substation in Sisak in Croatian transmission power system. Installation of new electric arc furnace, requires increased agreed power for Ironworks from TSO. New electric arc furnace is connected on low voltage side of T3 transformer with ratio 110/33 kV. As a part of the test operation of the new electric arc furnace in Ironworks in Sisak, detailed measurements of Voltage Quality, in different operating modes of the arc furnace were … Show more