“…However, local distribution grids, particularly those that feed high population density urban areas may require upgrades to the distribution infrastructure for accommodating the charging requirements of PEVs. Distribution transformers are expected to be impacted the most as there can be periods when the transformers feeding the PEVs will be loaded beyond their design limits, which may reduce their useful life [2], [3], [4] and [5]. This is particularly true if level 2 chargers (power requirement can be as high as 19.2 kW; typically 6.6 kW) are used for fast charging of PEVs at residences, or a cluster of such chargers are used for charging the PEVs at offices and commercial buildings (Google, Cisco, Facebook and many other companies have multiple PEV charging stations on their campuses).…”