4th International Conference on Power Engineering, Energy and Electrical Drives 2013
DOI: 10.1109/powereng.2013.6635822
|View full text |Cite
|
Sign up to set email alerts
|

Impacts of PV installation on the low voltage residental distribution networks: A case study of Yildiz

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
1
0
2

Year Published

2017
2017
2023
2023

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(3 citation statements)
references
References 2 publications
0
1
0
2
Order By: Relevance
“…Pada tulisan ini pemasangan dan penambahan PV yang dilakukan sangat tergantung terhadap tingkat penetrasinya, lokasi instalasi PV, jenis, kapasitas dan topografi jaringan [6], [7]. Menghitung persenan penetrasi PV sangat diperlukan.…”
Section: Pendahuluanunclassified
See 1 more Smart Citation
“…Pada tulisan ini pemasangan dan penambahan PV yang dilakukan sangat tergantung terhadap tingkat penetrasinya, lokasi instalasi PV, jenis, kapasitas dan topografi jaringan [6], [7]. Menghitung persenan penetrasi PV sangat diperlukan.…”
Section: Pendahuluanunclassified
“…Namun, meningkatkan penetrasi DG khususnya PV atau photovoltaic dan sistem angin atau PLTBayu menyebabkan banyak masalah teknis dalam sistem distribusi yang mempengaruhi kualitas daya dan keandalan jaringan [8]. Penetrasi PV yang tinggi menyebabkan banyak masalah tegangan termasuk kenaikan tegangan karena aliran daya yang terbalik dan kondisi beban yang rendah, fluktuasi tegangan karena perubahan kondisi cuaca, dan ketidakseimbangan tegangan karena perbedaan konfigurasi PV [7], [8].…”
Section: Pendahuluanunclassified
“…For example, research in [23,24] provides an overview of the various voltage analyses of distribution systems with distributed generation and compares different research on the voltage variations concerning solar PV penetration. The LV network, normally consisting of an individual secondary transformer, presents different limits depending on multiple factors, considering that voltage violations in the LV network can be avoided even at high penetration levels (around 90% of feeder maximum load [25]) in certain conditions. The voltage rise is highly sensitive to the position and concentration of PVs along the feeder [26].…”
Section: Introductionmentioning
confidence: 99%