Implementation plan for the Operations Center Upgrade project

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…[2], [3] The design status of the system also created some problems. As noted in Section 11, as-built drawings of the FCS did not exist and had to be created as part of the upgrade project.…”
Section: Constraints and Complicationsmentioning
confidence: 99%
See 1 more Smart Citation
“…[2], [3] The design status of the system also created some problems. As noted in Section 11, as-built drawings of the FCS did not exist and had to be created as part of the upgrade project.…”
Section: Constraints and Complicationsmentioning
confidence: 99%
“…[3] In the @st step the new system, consisting of both IDAIS I and System Integration equipment, was tested afler installation, but before final connection to field sensors. During this step, the facility DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights.…”
Section: Overview Of Projectmentioning
confidence: 99%