2011
DOI: 10.3141/2205-21
|View full text |Cite
|
Sign up to set email alerts
|

Improvement Recommendations for Unsealed Gravel Roads

Abstract: of the most appropriate timing of a maintenance treatment to maximize life extension or benefit.The existing literature shows a variety of project evaluation methods based on three main economic attributes-cost, benefits, and a combination of the two. In a typical project evaluation approach, alternatives capable of accomplishing the required function are analyzed, and the one associated with the least long-term cost is often selected (1, 2). The cost-only approaches assume that all alternatives provide simila… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
4
0

Year Published

2018
2018
2020
2020

Publication Types

Select...
5

Relationship

2
3

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 18 publications
(21 reference statements)
0
4
0
Order By: Relevance
“…WYT2/LTAP algorithm for selecting the best maintenance practice ( 11 ). Note: Wyoming Technology Transfer Center = WYT2/LTAP.…”
Section: Methodsmentioning
confidence: 99%
See 2 more Smart Citations
“…WYT2/LTAP algorithm for selecting the best maintenance practice ( 11 ). Note: Wyoming Technology Transfer Center = WYT2/LTAP.…”
Section: Methodsmentioning
confidence: 99%
“…Researchers have been mainly concerned about setting general rules or guidelines for managing gravel roads with minimum effort. This has resulted in a general lack of GRMSs that are suitable for small local agencies ( 411 ). Additionally, researchers’ efforts were more directed towards solving specific issues related to managing gravel roads within the jurisdiction of a particular agency ( 4 ).…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Collecting feasible gravel road condition data is considered one of the main challenges of building any GRMS ( 4 ). Gravel roads are very dynamic and their conditions vary quickly based on different traffic and weather conditions ( 2, 47 ). This leaves any plans for scheduled condition monitoring without any significant value ( 7 ).…”
mentioning
confidence: 99%