2008
DOI: 10.1016/j.autcon.2007.03.004
|View full text |Cite
|
Sign up to set email alerts
|

Improving AHP for construction with an adaptive AHP approach (A3)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
55
0

Year Published

2008
2008
2022
2022

Publication Types

Select...
5
4

Relationship

1
8

Authors

Journals

citations
Cited by 134 publications
(59 citation statements)
references
References 27 publications
0
55
0
Order By: Relevance
“…Additionally, Marzouk and Moselhi [29] designed a model for estimating markup and evaluating bid proposal using multi-attribute utility theory and AHP. Furthermore, Lin et al [30] applied an adaptive AHP approach to determine the weightings of multiple criteria for solving a bestvalue-bid problem. Overall, a multi-criteria evaluation scheme has been employed for real-life situations.…”
Section: Ahp For Determining Criteria Weightingsmentioning
confidence: 99%
See 1 more Smart Citation
“…Additionally, Marzouk and Moselhi [29] designed a model for estimating markup and evaluating bid proposal using multi-attribute utility theory and AHP. Furthermore, Lin et al [30] applied an adaptive AHP approach to determine the weightings of multiple criteria for solving a bestvalue-bid problem. Overall, a multi-criteria evaluation scheme has been employed for real-life situations.…”
Section: Ahp For Determining Criteria Weightingsmentioning
confidence: 99%
“…Then, the CI is divided by the random CI to acquire the consistency ratio (CR) [30]. When CR is N 0.1, pairwise comparison results should be rejected.…”
Section: Criteria Weightsmentioning
confidence: 99%
“…In the single criterion, statistical model is adopted. To facilitate the multi-criteria evaluation AHP model [14] is used because it is suitable to be adopted when there is a finite set of attributes to be considered in the evaluation process [17,18,19,21,22,23]. Firstly, the AHP model is experimented to foresee for its possible deficiency or impediment before it is implemented in the selected case study.…”
Section: Introductionmentioning
confidence: 99%
“…The influence of various factors on work efficiency and quality should be also evaluated. To make effective decisions in technological and management areas as well as in the processes of automation in construction, etc., expert systems (Česnauskis 2007;Podvezko et al 2010;Zavadskas et al 2005;Wu et al 2008;Abdelrahman et al 2008;Chua and Li 2000;Liu et al 2009;Brauers et al 2008;Мальцев, Захаренков 2007), multicriteria evaluation methods (Ginevičius and Podvezko 2008;Žvirblis and Zinkevičiūtė 2008;Sivilevičius et al 2008;Turskis et al 2009), decision support systems TOP-SIS and SAW (Jakimavičius and Burinskienė 2007;Liu 2009;Liaudanskienė et al 2009;Zavadskas et al 2010), games theory ) and AHP (Ginevičius et al 2004;Skibniewski and Chao 1992;Lin et al 2008;Lai et al 2008;Pan 2008;Podvezko 2009;Ustinovichius et al 2007;Vainiūnas et al 2009) method are commonly used. The procedures of ranking based on statistical hypotheses and their verification are also applied (Weed et al 2007).…”
Section: Introductionmentioning
confidence: 99%