2019 IEEE/AIAA 38th Digital Avionics Systems Conference (DASC) 2019
DOI: 10.1109/dasc43569.2019.9081706
|View full text |Cite
|
Sign up to set email alerts
|

Improving End-To-End Delay Analysis for TT and RC Traffic of TTEthernet in DIMA Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(6 citation statements)
references
References 10 publications
0
6
0
Order By: Relevance
“…The values of BAG provide a limited dynamical range for flow control. Furthermore, BAG is application-specific and suitable for scheduling parameters in avionics networks [1].…”
Section: B Virtual Links (Vls)mentioning
confidence: 99%
See 4 more Smart Citations
“…The values of BAG provide a limited dynamical range for flow control. Furthermore, BAG is application-specific and suitable for scheduling parameters in avionics networks [1].…”
Section: B Virtual Links (Vls)mentioning
confidence: 99%
“…IMA is an established architectural methodology that has been successfully applied in various aircrafts such as A380 and B787 [1]. IMA considers multiple requirements and combinations of relations of several avionics applications and distributes it to desired sections.…”
Section: Integrated Modular Avionics and Distributed Modular Avionicsmentioning
confidence: 99%
See 3 more Smart Citations