2018
DOI: 10.1016/j.ijepes.2018.01.029
|View full text |Cite
|
Sign up to set email alerts
|

Improving power supply design for high speed lines and 2 × 25 systems using a genetic algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 13 publications
(6 citation statements)
references
References 20 publications
0
6
0
Order By: Relevance
“…Each profile represents a single run of a train on a specific track which may consist of multiple of sections. A similar approach can be found in [14], [30], [29], [35], [31], [22], [33], [16], [34].…”
Section: Autotransformer Modelmentioning
confidence: 99%
See 1 more Smart Citation
“…Each profile represents a single run of a train on a specific track which may consist of multiple of sections. A similar approach can be found in [14], [30], [29], [35], [31], [22], [33], [16], [34].…”
Section: Autotransformer Modelmentioning
confidence: 99%
“…This lumped parameter circuit or a small variation of it, is used for most of the researchers that develop power flow algorithms for these kind of systems. There are many researchers that also neglect the mutual impedances [23], [24], [25], [26], [14], [27], [28], [16], [5], [29], [30] simplifying the system to the limit removing the off diagonal terms of admittance matrix. The system is much lighter from the computational point of view, but the accuracy of the calculation is lower since the effect of the inductive couplings is not negligible.…”
Section: Mathematical Modelmentioning
confidence: 99%
“…The article [12] presents the concept of implementing a hybrid energy storage system (HESS) to reduce the demand for 15 min peak power, while [13] presents the control strategy for this system. A further effect of such a development is the reduction of fixed operating costs [14][15][16]. A very important aspect related to the implementation of BESS is optimal sizing and location [17][18][19][20][21] and control strategy [22].…”
Section: State-of-the-art Battery Energy Storage Systemsmentioning
confidence: 99%
“…One of the most common applications is the optimal allocation of resources. Examples in [95] and [96] present an optimisation problem combining multi-train simulation called HAMLET railway simulator with genetic algorithms to determine the best positions for the substations, neutral zones, autotransformers, etc. The authors consider environmental factors, prohibited zones or accessibility for maintenance.…”
Section: B Specific Cases Of Use Of Simulation Tools and Modelsmentioning
confidence: 99%