“…These resources types include the first, the second, the fifth and the eighth. Therefore, the first code, the second code, the fifth code, and the eighth code in [1,3,8,8,1,6,7,1,8,6] are valid codes. For these four types of necessary maintenance resources, their scheduling paths correspond to the first path, the third path, the first path, and the first path, respectively.…”