2017 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) 2017
DOI: 10.1109/ieem.2017.8290092
|View full text |Cite
|
Sign up to set email alerts
|

Improving the material flow of a manufacturing company via lean, simulation and optimization

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 13 publications
(4 citation statements)
references
References 23 publications
0
4
0
Order By: Relevance
“…Despite decades-long literature and the importance of warehouse planning, several literature reviews have concluded that few scientific journals have addressed the applicable systematic approach [35,62,63]. In fact, the systematic analysis of warehouse design subprocesses themselves is addressed in several studies [63,64], in subprocesses, for example, examining the issue of flight planning or the layout of storage systems [64,65]. In contrast, there is no overlapping study between subprocesses to find a possible optimum.…”
Section: Overview Of the Area Of Storage System Designmentioning
confidence: 99%
“…Despite decades-long literature and the importance of warehouse planning, several literature reviews have concluded that few scientific journals have addressed the applicable systematic approach [35,62,63]. In fact, the systematic analysis of warehouse design subprocesses themselves is addressed in several studies [63,64], in subprocesses, for example, examining the issue of flight planning or the layout of storage systems [64,65]. In contrast, there is no overlapping study between subprocesses to find a possible optimum.…”
Section: Overview Of the Area Of Storage System Designmentioning
confidence: 99%
“…The total predicted costs of the 1-th sub-company in case of making the order represented by Z 0 are calculated as follows (25):…”
Section: Mathematical Modelmentioning
confidence: 99%
“…These are parameters that, besides others, are directly linked to the concept of the so-called lean company (or lean manufacturing, lean logistics, etc.) and Kanban [25], [26], [27], [28], [29]). It should be noted that this paper deals with efficiency issues by automatically assuming that discounting or shortening the time of production, distribution or other business processes never leads to a decrease in quality.…”
Section: Introductionmentioning
confidence: 99%
“…A similar approach was used by Sankaran et al [10] to reduce the cost of the pump manufacturing process, by the means of finding the adequate batch size and interarrival time. Some researchers propose to combine simulation with lean management approach [11][12][13][14]. Combination with Value Stream Map (VSM) tool is also used [15,16], to shorten the production time, reduce work-in-process and increase value-added time for manufacturing processes.…”
Section: Introductionmentioning
confidence: 99%