2010
DOI: 10.1109/tii.2010.2055877
|View full text |Cite
|
Sign up to set email alerts
|

Improving the Worst-Case Delay Analysis of an AFDX Network Using an Optimized Trajectory Approach

Abstract: Avionics Full Duplex Switched Ethernet (AFDX) standardized as ARINC 664 is a major upgrade for avionics systems. The mandatory certification implies a worst-case delay analysis of all the flows transmitted on the AFDX network. Up to now, this analysis is done thanks to a tool based on a Network Calculus approach. The more recent Trajectory approach has been proposed for the computation of worst-case response time in distributed systems. This paper shows how the worst-case delay analysis of the AFDX can be impr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

2
133
0

Year Published

2013
2013
2016
2016

Publication Types

Select...
4
2
1

Relationship

0
7

Authors

Journals

citations
Cited by 143 publications
(135 citation statements)
references
References 15 publications
2
133
0
Order By: Relevance
“…Formal timing analysis using CPA for strict-priority Ethernet was presented in Rox and Ernst (2010). In Bauer et al (2010) the trajectory approach was applied to analyze Avionics Full Duplex Switched Ethernet (AFDX).…”
Section: Related Workmentioning
confidence: 99%
“…Formal timing analysis using CPA for strict-priority Ethernet was presented in Rox and Ernst (2010). In Bauer et al (2010) the trajectory approach was applied to analyze Avionics Full Duplex Switched Ethernet (AFDX).…”
Section: Related Workmentioning
confidence: 99%
“…However, for frames transmitted from the same input link, their transmissions are necessarily serialized (physical constraint) and they cannot arrive at the output port at the same time. In the following paragraphs, the serialization effect and its solution to the Trajectory approach proposed in [8] are briefly recalled.…”
Section: The Serialization Of Framesmentioning
confidence: 99%
“…Flows crossing an output port h are transmitted In [8], an optimization on the Trajectory approach has been proposed by taking into account the serialization effect. An illustration of the optimization is shown in Figure 6.…”
Section: The Serialization Of Framesmentioning
confidence: 99%
See 2 more Smart Citations