“…Instead of iteratively expanding the transmission system to relieve binding constraints in a least cost manner, however, the MISO '06 study proposed a single transmission solution that would eliminate all pre-existing binding transmission constraints, even before the addition of 16 GW of wind capacity (Osborn and Wilson 2007).…”