2020
DOI: 10.1007/s10696-020-09389-1
|View full text |Cite
|
Sign up to set email alerts
|

Incorporating shifting bottleneck identification in assembly line balancing problem using an artificial immune system approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 38 publications
0
2
0
Order By: Relevance
“…The assembly-line type-E balance problem is to find a set number of workstations and cycle time to maximize the balance efficiency of the assembly line. The methods to solve the assembly-line, type-E balance problem mainly include precise algorithms [32,33] and intelligent algorithms [34,35]. In 2011, Wei [32] first studied the assembly-line, type-E balance problem and used the LINGO software to solve the exact solution.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The assembly-line type-E balance problem is to find a set number of workstations and cycle time to maximize the balance efficiency of the assembly line. The methods to solve the assembly-line, type-E balance problem mainly include precise algorithms [32,33] and intelligent algorithms [34,35]. In 2011, Wei [32] first studied the assembly-line, type-E balance problem and used the LINGO software to solve the exact solution.…”
Section: Introductionmentioning
confidence: 99%
“…Zacharia [34] proposed a heuristic algorithm to solve the fuzzy, assembly-line, type-E balance problem. Mohd [35] used the swarm of immune cells alogorithm to solve the assembly-line, type-E balance problem with resource constraints and bottleneck identification.…”
Section: Introductionmentioning
confidence: 99%