Increasing Black Start Capacity by Fast Cut Back Function of Thermal Power Plants

Abstract: Power system restoration is well recognized as one of the most important tasks for electric power grids. During the restoration process, preparation is the first stage, in which time is critical, and many non-blackstart units need to be cranked. The black start capacity plays a key role in preparation stage. This paper addresses thermal units with fast cut back (FCB) function as black start units. The model of FCB unit and algorithm for black start capacity assessment accounting for FCB unit is proposed. First… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
3
0
1

Year Published

2014
2014
2022
2022

Publication Types

Select...
5
1

Relationship

2
4

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 9 publications
0
3
0
1
Order By: Relevance
“…Bu işlem sonucunda en uygun yük seçimi yapılmalıdır [19]. Yeniden başlatma kapasitesinin restorasyon hazırlık aşamasında kilit bir rol oynadığı görülmüştür [20]. Güç sistemlerinde yeniden başlatma özelliğinin kullanılabilmesi için planlama sürecinde sistem dinamikleri ile ilgili olarak birçok görüş sunulmuştur [21].…”
Section: Güç Sistemlerinin Restorasyonuunclassified
“…Bu işlem sonucunda en uygun yük seçimi yapılmalıdır [19]. Yeniden başlatma kapasitesinin restorasyon hazırlık aşamasında kilit bir rol oynadığı görülmüştür [20]. Güç sistemlerinde yeniden başlatma özelliğinin kullanılabilmesi için planlama sürecinde sistem dinamikleri ile ilgili olarak birçok görüş sunulmuştur [21].…”
Section: Güç Sistemlerinin Restorasyonuunclassified
“…One mainly discussed the function of the FCB unit and introduced field tests about it [10]. The other mainly studied how to use the FCB unit to accelerate the black start process of power systems [13,14]. However, as far as the authors know, there is no paper that has studied the dynamic response of the FCB unit under load rejection and black start process conditions.…”
Section: Introductionmentioning
confidence: 99%
“…The simulation work helps in the best way of loading the power plants and is applied for hydro power plant and steam power plant restoration [2]. The power system restoration problem involves so many factors like frequency monitoring, black start unit energization, transmission line energization and transformer energization [3]- [5]. Data Envelopment Analysis technique is used to evaluate efficiency of different types of Decision Making Units (DMUs) including transmission lines energization, performance evolutions of different electrical distribution utilities [6]- [8].…”
Section: Introductionmentioning
confidence: 99%