2022
DOI: 10.31897/pmi.2022.66
|View full text |Cite
|
Sign up to set email alerts
|

Increasing the content of coarse fractions in the mined coal mass by a combine using paired cuts

Abstract: The main volume of coal is mined underground using shearers. In modern shearers, auger actuators are mainly used, which are distinguished by the simplicity of design, manufacturability and reliability. However, in the process of separating coal from mass by cutting, the yield of fine grades is 40-50 % of the total production volume. Therefore, the search and development of technical solutions that provide an increase in the yield of large fractions in the process of coal mining with auger shearers is an urgent… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 23 publications
0
2
0
Order By: Relevance
“…When extracting minerals from the deposit using a specific technological scheme that involves the MCCC as the destination, in combination with a mobile CBM for sequential mining on two horizons, it is crucial to consider all potential periods of inactivity of the mining and loading machine (20,21). The predicted mining time of the exit ledge and the evaluated range of operating productivity of the MCCC were determined based on the proposed approach for the conditions of the Angren coal mine (22,23).…”
Section: Methodology For Determining Mining Time Of An Inclined Exit ...mentioning
confidence: 99%
See 1 more Smart Citation
“…When extracting minerals from the deposit using a specific technological scheme that involves the MCCC as the destination, in combination with a mobile CBM for sequential mining on two horizons, it is crucial to consider all potential periods of inactivity of the mining and loading machine (20,21). The predicted mining time of the exit ledge and the evaluated range of operating productivity of the MCCC were determined based on the proposed approach for the conditions of the Angren coal mine (22,23).…”
Section: Methodology For Determining Mining Time Of An Inclined Exit ...mentioning
confidence: 99%
“…The results of the calculations for establishing the excavator bucket fill factor during the formation of the exit scarp (21,30,31) are presented in Table 7. To fill the bucket with a cap in accordance with GOST R 55165-2012, the excavator at one digging run has a minimum required face height of 4m.…”
Section: Table 6 Basic Technological Parameters Of the Scarp Miningmentioning
confidence: 99%